Wild Rice Electric Cooperative - A Touchstone Energy Cooperative   homecontact
Call before you dig! Gopher State One Call 1-800-252-1166 | Northern Safety & Security
member advantages
money saving programs
bill payment
safety information
power outages
security systems
associated links

 
Rate Schedule

Effective March 18, 2011

 

FARM AND HOME SERVICE

Facility
Charge:
Up to 7.5 KVA transformer   $25.00 (min.)
  10 KVA transformer   $27.50
  15 KVA transformer   $30.00
  25 KVA transformer   $32.50
  37.5 KVA transformer   $35.00
  50 KVA transformer   $37.50
Energy
Charge:
First 500 kwhs @ 10.5¢; balance kWhs @ 9.5¢

 
 

VILLAGE RESIDENTIAL SERVICE

Facility
Charge:
Up to 5 KVA transformer   $23.00 (min.)
  7.5 KVA transformer   $25.00
  10 KVA transformer   $27.50
  15 KVA transformer   $30.00
  25 KVA transformer   $32.50
  37.5 KVA transformer   $35.00
  50 KVA transformer   $37.50
Energy
Charge:
First 500 kwhs @ 10.5¢; balance kWhs @ 9.5¢

 
 

IRRIGATION AND GRAIN DRYER SERVICE

Facility
Charge:
Up to 7.5 KVA transformer   $25.00 (min.)
  10 KVA transformer   $27.50
  15 KVA transformer   $30.00
  25 KVA transformer   $32.50
  37.5 KVA transformer   $35.00
  50 KVA transformer   $37.50
  Over 50 KVA transformer   $37.50 for each 50
 

KVA of transformer capacity installed, or fraction thereof, plus appropriate share for any direct equipment, additional distribution and/or other costs to serve the load.

Energy
Charge:

All kWhrs used March 18th through December 18th - 7.4¢           All kWhrs used December 18th through March 18th - 11.0¢

 
 

LARGE POWER SERVICE

Facility
Charge:

$37.50 for each 50 KVA of transformer capacity installed, or fraction thereof, plus the appropriate share for any direct equipment, additional distribution and/or other costs required to serve the load.

Demand
Charge:

$9.25 per month per KW of billing demand

Energy
Charge:

Regular:    

6.0¢ per kilowatt hour

Off PeaK:   

Long Term..........................4.5¢
                Intermittent Cycled..............4.5¢
                Intermittent Non-Cycled.......4.8¢
                Short Term.........................5.5¢

 
 

AUTOMATIC YARD LIGHT SERVICE

Charge Per Light:

Yard Lights (monthly)

$8.75
Other Charges:

The consumer shall be responsible for the reasonable care of the light, including repair of vandalism, damage or breakage.

Moving or reinstalling of an existing light will be on a time and material basis with a minimum charge of $40.00. Posts and fixtures for ornamental installations will be paid for or provided by the consumer.

 
 

OFF PEAK HEATING PROGRAMS & RATES

To review the Off Peak Heating Programs and Rates, please go to Off Peak Heating or call our Member Services Department at (218) 935-2517 or (800) 244-5709.

 
:: Understanding
   Your Bill
::
Rate Schedule
::
Automatic Payment

:: Budget Payment
:: Collection Policy
:: Cold Weather Law
:: Sales Tax Credit
:: Operation Round-up®
   (PDF Form)
:: Automatic Meter
   Reading
:: Stopped Meters
:: Rate Codes
 

Member Advantages :: Money Saving Programs :: Bill Payment :: Safety Information
Power Outages :: Security Systems :: Additional Products :: Associated Links
Home :: Contact Us

Wild Rice Electric Cooperative Inc., 502 North Main, Mahnomen, MN 56557
Phone: 218-935-2517 or 800-244-5709  Fax: 218-935-2519 E-mail: info@wildriceelectric.com

Copyright © 2002 Wild Rice Electric Cooperative Inc. All rights reserved.